Sunday, November 11, 2012

My Cable-athon Continues

I've decided to do some of the cable projects I've had ready to go for this year's stash knit down. I'm working on my 2012 stash bag and am trying to knit 50 x 200g of Bendi. I will go over the 40, which is an excellent improvement on the 4.5 x 200g that I managed in 2011.

My next cable cardi, is one from Vague - I know they call themselves "Vogue" but errors abound in so many of their vague patterns, this is normal. This one is from Fall 2008, the Old Penny Cardi or as they have renamed it - #11 Forestry.  And I'm writing about how I'm doing this on the machine. I'm putting a 30st panel into the centre back, as quite a few people have.

The cable pattern is an old one, done over 5 stitches, 1 and 5 are swapped, one goes behind, one in front, and the three in the middle remain in the same place. We've just had Susan Guigliumi visiting, and I'm bringing her bridging ideas into the mix.

I'm using the hold and part levers to put in some extra slack so I can do the four cables. On the row before I'm due to cross the cables,  I pinch the RS levers into the centre - hold and part. and hold on
bring all the pattern needles to hold and knit +1 or +2 MT
the left, then the 30 needles covering the centre panel are pulled out to hold.

Knit up to the held needles, disengage the row counter, then back up, and put the left side lever into part, take off the hold, and +1MT on the stitch dial, in this case, up to T5 then knit the 30 centre needles, back up, bring all the remaining needles all the way out to hold, reduce the stitch dial to MT (T4) and knit them. Re-engage the row counter.



Bring needles to be crossed out all other to UWP so none can unravel during cabling


bring the middle 3 to UWP, one stitch goes behind, one goes in front

Here the stitch going in front is being collected with the latch tool

Here, the stitch at the back is hanging on its correct needle and the front stitch is being teased into position by the latch tool

the infront stitch is on the needle and the back stitch is going onto it's new needle

Here they are done


and this is really how I collect the front stitch, but it's not much of a photos. Park the stitch going back onto it's prong, remove the front stitch and put it onto the latch tool and hold it, then move the back stitch into the new position, then pop the front on on it's new needle.


There is a bit of pulling

but putting them all back into UWP helps the machine knit them off

And there they are knitted. All to do now is latch back the two purl stitches



1 comment:

Ewa said...

nice machine :) ewa